Convection Section Geometry Calculator
Estimate inline plain-tube convection-section dimensions, frontal area and geometric free-flow area.
Preliminary engineering estimate. Review the model assumptions and applicability limits below before using results.
Not calculated. Press Calculate; editing any input clears previous results.
Calculation Results
| Parameter | Calculated Value | Unit |
|---|---|---|
| Internal section width | — | m |
| Internal section height | — | m |
| Internal section gas-flow depth | — | m |
| Total tube quantity | — | — |
| Tube rows | — | — |
| Tube columns | — | — |
| Transverse pitch | — | m |
| Longitudinal pitch | — | m |
| Transverse clear gap | — | m |
| Longitudinal clear gap | — | m |
| Gross frontal area | — | m² |
| Minimum geometric free-flow area | — | m² |
| Free-to-frontal area ratio | — | — |
| Internal section volume | — | m³ |
| Orientation and exclusions | — | — |
Input Summary
| Parameter | Input Value |
|---|---|
| Tube outside diameter (m) | 0.1 |
| Active tube length along section height (m) | 6 |
| Rows along gas-flow depth | 6 |
| Columns across section width | 8 |
| Transverse centre-to-centre pitch (m) | 0.2 |
| Longitudinal centre-to-centre pitch (m) | 0.2 |
| Clearance at each side wall (m) | 0.1 |
| Clearance at each tube end (m) | 0.1 |
| Upstream clearance (m) | 0.3 |
| Downstream clearance (m) | 0.3 |
Method and formulas
W = (Ncolumns −1)ST + Do +2cside; H = L +2cend; Dsection = (Nrows −1)SL + Do + cupstream + cdownstream.
Afrontal = WH; Amin = WH − NcolumnsDoL; Ntotal = NrowsNcolumns.
Assumptions and applicability
Rectangular internal enclosure, inline plain horizontal tubes, gas flow normal to tube axes along section depth. The stated width/height orientation is a bookkeeping convention. Free area includes ideal side/end bypass; it excludes support plates, fins, soot and flow maldistribution. Not a casing, refractory or structural design. Preliminary engineering only; no API 560 compliance claim. Radiation, mechanical integrity, fouling evolution and detailed vendor design require separate assessment.
Frequently asked questions
Is this a complete fired heater design?
No. This is a preliminary convection-section model with the stated assumptions. It does not establish API 560 compliance.
Why do results clear when an input changes?
A previous result no longer represents the edited conditions. Press Calculate to evaluate the current inputs; Reset and Load Example restore the example.