1. Design fired demand and selected rating
2. Minimum load and turndown

Not calculated. Press Calculate; editing any input clears previous results.

Calculation Results

ParameterCalculated ValueUnit
Required burner quantity——
Required design duty per burner—W
Selected nominal burner rating—W
Total installed nominal capacity—W
Installed nominal capacity margin—%
Design operating load per burner—%
Minimum requested all-burner load—%
Minimum stable total load with all burners—W
Minimum requested duty per burner—W
Required all-burner turndown ratio——
Operating range check——

Input Summary

ParameterInput Value
Design fired input (margin already included) (kW)5,000
Selected nominal rating per burner (kW)1,000
Maximum permitted operating fraction of rating (%)90
Minimum required total fired load (kW)1,000
Supplied per-burner turndown ratio5

Method and formulas

N = ceil[Qdesign/(Qrating×maximum load/100)]; Qinstalled = NQrating; Qdesign per burner = Qdesign/N.

Installed margin = (Qinstalled/Qdesign −1)×100%; minimum stable all-burner duty = Qinstalled/turndown. Compare minimum requested demand with that limit.

Assumptions and applicability

Input is already design fired heat input; no efficiency or additional margin is applied. Maximum fraction is supplied by the designer, not a universal derating factor. All burners are assumed equally loaded and operating. A low-load failure requires a separate staging/control/vendor assessment, not automatic approval. Turndown ≥1; minimum load must not exceed design load. Preliminary selection only; no API 560 compliance or vendor burner performance certification. Flame geometry, emissions, stability, controls, materials and installation design require separate assessment.

Frequently asked questions

Is this a complete or certified burner design?

No. This tool performs the stated preliminary calculation. Final selection requires qualified vendor performance, combustion controls and the applicable design review.

What happens when I change an input?

Results clear immediately. Press Calculate to evaluate current inputs. Reset and Load Example restore the illustrated input set.

Engineering references

  1. DOE / IHEA — Process Heating Sourcebook (2007)
  2. API 560 — public scope, sixth edition (2026)